VAARIS KPI
Training Modules

Interactive Case Studies in Active Asset Management

These 10 interactive case studies demonstrate world-class diagnostic thinking and strategic response formulation. Each module guides you through a real-world scenario, helping you connect data points, identify root causes, and formulate precise, high-impact challenges that drive operator performance.

Master the Art of the Challenge

The VAARIS KPI Framework

Our Dashboard for Decision-Making: From Passive Owner to Active Asset Manager

The North Star: Free Cash Flow (FCF)

FCF = (Revenue - Opex) - Capex

Everything we do must connect to this formula. FCF is the ultimate diagnostic trigger.

Financial Levers
KPI 1: Free Cash Flow
The ultimate outcome
KPI 2: Lifting Cost
< $12/boe
KPI 3: Capital Efficiency
Payback < 2 years
Operational Engine
KPI 4: Production Attainment
> 95%
KPI 5: Asset Uptime
> 95%
KPI 6: Well Delivery
> 80%
License to Operate
KPI 7: TRIR (Safety)
< 0.5
KPI 8: LOPC (Integrity)
Zero
KPI 9: Community Disruptions
< 2/month
Our Accountability
KPI 10: G&A as % of Revenue
< 5%
T
TotalEnergies
The Tanker
  • • 4-5 Management Layers
  • • Global Portfolio Priorities
  • • Slow, Bureaucratic Decisions
  • • Focus on Volume & Reserves
V
VAARIS SPV
The Speedboat
  • • 2 Lean Layers
  • • Singular Asset Focus
  • • Agile, Asset-Level Decisions
  • • Focus on Cash Flow & Returns

"Our value comes from being smarter, faster, and more focused."

Interactive Case Studies

Advanced

The False Victory

KPI 1: Free Cash Flow (FCF)

Exposing short-term wins that sacrifice long-term value

Intermediate

The Hidden Debt

KPI 2: Lifting Cost per Barrel

Identifying false economies in maintenance spending

Advanced

The Bundle Trap

KPI 3: Capital Efficiency

Unbundling portfolios to force value-based ranking

Intermediate

Death by a Thousand Cuts

KPI 4: Production Attainment

Moving from reactive firefighting to systemic solutions

Advanced

The Recurring Failure

KPI 5: Asset Uptime

Demanding root cause analysis over component replacement

Intermediate

The Unforeseen Excuse

KPI 6: Well Delivery Performance

Challenging failures of project risk management

Critical

The Blame Game

KPI 7: TRIR (Safety)

Asserting operator accountability for all personnel

Critical

The Temporary Fix

KPI 8: LOPC (Integrity)

Preventing normalization of deviation

Advanced

The Security Trap

KPI 9: Community Disruptions

Shifting from security to stakeholder engagement

Leadership

The Consultant Temptation

KPI 10: G&A as % of Revenue

Defending internal discipline and the VAARIS Way

VAARIS Strategic Documents

Comprehensive frameworks, analyses, and board presentations

VAARIS SPV Strategic Framework

Complete board presentation with JOA governance framework, organizational structure, and value optimization roadmap

VAARIS vs. TotalEnergies Analysis

Detailed comparative analysis of JV management structures, highlighting VAARIS competitive advantages

40-Case Study Matrix

Comprehensive case studies across all 10 KPIs and 4 operational workstreams with professional challenge responses for Renaissance subcommittee meetings

Training Presentation Script

90-minute training script for delivering the 40-case study matrix workshop with detailed walkthroughs and role-play exercises

Training Presentation Slides

20-slide professional presentation deck covering the challenge philosophy, committee structure, and 10 exemplar case studies

How to Use These Modules

1

Click on any case study to begin the interactive diagnostic process

2

Progress through each step, revealing the analysis layer by layer

3

Study the strategic responses and understand the reasoning behind each word

4

Practice formulating your own responses before revealing the expert solution